Hyperscale projects can’t stop for an OSHA shutdown.
Freedom Safety provides outsourced safety management for GCs, MEP subcontractors, and trade contractors working on data center construction sites across Texas and Oklahoma.
Hyperscale sites carry hazards most safety programs weren’t built for.
Traditional construction safety programs miss the unique risk profile of mission-critical facilities. Data center construction combines electrical, mechanical, civil, and structural work at massive scale — often under aggressive schedules that amplify safety risk.
Electrical Hazards at Scale
Medium-voltage switchgear, 2N power distribution, UPS installations, and energized equipment create arc flash and electrocution risks requiring NFPA 70E compliance and strict LOTO programs.
Confined Space Entry
Cable vaults, utility tunnels, and mechanical rooms qualify as permit-required confined spaces under OSHA 1926.1201. A single unprotected entry can be fatal.
Multi-Contractor Coordination
Hyperscale sites run dozens of subcontractors simultaneously. Without a controlling contractor safety plan, accountability gaps create OSHA multi-employer citation exposure for every party.
Fall Protection Requirements
Raised floors, elevated mechanical platforms, rooftop cooling equipment, and large structural work create fall exposure at every phase. OSHA 1926 Subpart M requires site-specific written plans.
Heat Illness in Texas
Federal OSHA’s General Duty Clause applies to heat exposure on Texas construction sites. Data center projects in West and Central Texas require written heat prevention plans with water, rest, and shade.
ISNetworld / Avetta Compliance
Every major data center owner — Oracle, Google, Vantage, DataBank — requires subcontractors to be prequalified before mobilizing. A bad grade means your crew doesn’t get on site.
Everything you need — without the full-time hire.
Freedom Safety acts as your outsourced safety department from pre-bid to project closeout.
ISNetworld & Avetta Management
We set up, manage, and maintain your contractor compliance accounts. RAVS submissions, EMR management, program uploads, and incident tracking — so you stay in good standing with hyperscale owners and GCs.
Site Safety Audits
On-site walk-throughs tailored to data center construction phases — civil, structural steel, MEP rough-in, and commissioning. Written findings with corrective action reports before OSHA finds them first.
Safety Program Development
We write OSHA-compliant written programs specific to your scope: confined space, LOTO, fall protection, electrical safety, and hot work. Customized to your company — not a generic template.
DOL 10 & 30-Hour Construction Training
On-site courses in English and Spanish, scheduled around your crew’s calendar. Built for real construction environments — not a lecture hall.
OSHA 300 Recordkeeping
We maintain your OSHA 300 injury and illness log, prepare the 300A Summary, and ensure annual posting compliance — protecting your EMR rate and ISNetworld standing.
Incident Investigation
Formal root cause analysis, corrective action plans, and OSHA notification support when incidents occur. Response time and documentation quality determine your exposure.
Scalable support for every project phase.
From qualifying for your first hyperscale subcontract to managing safety across multiple active sites.
Compliance Foundation
- ISNetworld / Avetta account setup
- Written safety programs (5 core)
- OSHA 300 recordkeeping
- Compliance dashboard access
- Monthly compliance check-in
Active Safety Department
- All Bronze services
- Quarterly on-site safety audits
- Incident response support
- DOL 10 & 30-Hour Construction training
- Subcontractor safety reviews
- ISNetworld ongoing maintenance
Fractional Safety Director
- All Silver services
- Regular on-site presence
- Owner / GC meeting attendance
- Pre-task planning support
- Executive safety reporting
- Strategic safety planning
Built from the field. Not a desk.
Every recommendation we make is grounded in actual jobsite experience. We know what OSHA inspectors look for — because we’ve been on those sites.
Texas leads the nation with 140+ data centers under construction as of 2026. With 1,500+ workers on a single hyperscale site, safety oversight isn’t optional — it’s what keeps your project and your company moving.
Veteran-Owned & Operated
Military-grade discipline and accountability on every engagement. We don’t cut corners — because our clients can’t afford to.
No Full-Time Hire Required
A safety director runs $90K–$130K per year. Freedom Safety gives you that expertise at a fraction of the cost, on your schedule.
ISNetworld & Avetta Certified
We know these platforms inside and out. We’ll get your grades where they need to be and keep them there.
Texas & Oklahoma Coverage
DFW, Abilene, West Texas, Houston, San Antonio, Oklahoma City, Tulsa — we’re where the data centers are being built.
English & Spanish Training
We deliver OSHA training in both languages so your entire workforce understands the hazards — not just supervisors.
Digital Compliance Dashboard
QR-code training verification, driver qualification files, and real-time safety documentation — all in one place your team can access from the field.
Ready to mobilize on your next data center project?
Start with a free, no-obligation safety compliance review. Know where you stand before OSHA — or your GC — does.
Get Your Free Review (972) 413-8635